SHL Pile Followers 2016
Production of 2 pile followers, including lifting beam and stubbing point.
              Production of 2 pile followers, including lifting beam and stubbing point.
Dimensions  | 
                
                  
  | 
              ||||||
Welding qualifications  | 
                EN-ISO 15609-1 / 15614-1  | 
              ||||||
specific  | 
                GS HL 201.001  | 
              ||||||
qualification  | 
                QA / QC client  | 
              ||||||
Production time  | 
                10 weeks  | 
              ||||||